Temporary Accommodation:
Our school has been sanctioned to proceed with the planning and rental of four specialist rooms for September 2019. Students will have access to two fully fitted out Science Laboratories and two fully fitted out Technology Rooms. These specialist rooms will be equipped to the highest standards required for Leaving Certificate students.
A contingency plan is in place if there is a hiatus at the start of the academic year.
The school is also receiving a new student toilet block as well as enhanced facilities for staff.

Permanent Accommodation:
A design consultant and a project manager have been appointed to the project on Novara Road. The master planning of this site will conclude in a number of weeks.